SEAI €300 off a home charger, if you do it in the right order Check where you stand →
Get my price
Home  /  How to claim the grant

How to claim the SEAI home charger grant

The SEAI home charger grant is up to €300. You apply first, wait for a Letter of Offer, have a Safe Electric registered electrician fit a charger from SEAI's Smart Charger Register, then send the claim forms within six months. SEAI says payment takes about 4 to 6 weeks once it has every document (SEAI).

Key points

Before you apply

Check these first. Each one is a condition on SEAI's grant page (SEAI).

You don't need to own an electric car yet. SEAI says homeowners and residents can apply whether or not they own an EV, so the offer can be in place before the car arrives.

Have two things ready: your MPRN, the 11-digit number on your electricity bill, and your Eircode.

The steps, in order

  1. Apply online. Use SEAI's Apply Now portal with your MPRN and Eircode. If your development isn't listed, SEAI asks you to email it.
  2. Wait for the Letter of Offer. It sets out the terms and comes with a link to the Payment Request Form, plus a separate Installation Details Form for your electrician.
  3. Book the electrician for a date after the start date on the letter. Do not let anyone start work before the start date on your Letter of Offer. SEAI treats spending before that date as ineligible, and work done before an offer is issued doesn't qualify at all.
  4. Have the charger fitted within 6 months of the Letter of Offer.
  5. The electrician completes the Installation Details Form and sends Certificate Number 3 to Safe Electric Ireland.
  6. You complete the Payment Request Form with your bank details and send it with Certificate Number 3, the Test Record Sheet, the invoices for the charger and the installation, and photos of the installed charger.
  7. SEAI checks and pays. It verifies the certificate and the electrician's registration, then pays by electronic transfer, about 4 to 6 weeks after it has all the documents. It may visit to check the installation, and refusing a visit can lead to the grant being revoked or clawed back.

Who provides which document

DocumentWho provides itGoes to
Letter of Offer and Payment Request Form linkSEAIYou
Installation Details FormYour electricianSEAI
Certificate Number 3Your electricianSafe Electric Ireland, and a copy with your claim
Test Record SheetYour electricianWith your claim
Invoices for the charger and the installationYour installerWith your claim
Photos of the installed chargerYou or the installerWith your claim
Signed Payment Request Form with bank detailsYouSEAI

How long it takes

The offer is valid for 6 months, and every document has to be in within 6 months of the offer date. SEAI then allows about 4 to 6 weeks to pay. On the installation side, most installs take 2 to 4 weeks from order, depending on grant approval and demand. Ask your installer for their own lead time before you apply, so the 6 months doesn't run out.

What the grant doesn't pay for

The grant covers up to 100% of the charger and its installation, to a maximum of €300, and invoices for both are required. SEAI says wiring upgrades such as earthing, meter tails or bonding are not grant-eligible. If your fuse board or meter tails need work, that's on top: see the usual costs of these extras on our EV charger installation cost page.

If you won't finish in time

If you can't complete the job within 6 months, SEAI says you can cancel with its cancellation form and reapply later. If the works have already started, carry on with the original application and tell SEAI.

Checking where your claim is

SEAI has an application status checker. You need your email address and either your MPRN or your EVHC application ID. SEAI's emails can land in junk, so check there before chasing.

Letting an installer apply for you

Companies can apply on a resident's behalf once they have registered with SEAI, using their company name, contact details and CRO number. Both the company and the resident receive the Letter of Offer, and the resident gets an email asking them to sign to verify the claim. The grant is only approved where the beneficiary is a private individual.

The one rule people break

Do not let anyone start work before the start date on your Letter of Offer. SEAI treats spending before that date as ineligible, and work done before an offer is issued doesn't qualify at all. Our grant check takes about forty seconds.

Fixed written price

Want the grant done in the right order?

Tell us where you are. We come back with a fixed written price, and the Safe Electric registered contractor we introduce you to knows the SEAI steps.

No cost, no obligation. We price the job and introduce you to a Safe Electric registered electrical contractor. We are not an electrical contractor ourselves.

Questions about claiming the grant

How do I claim my EV charger grant?

Apply online to SEAI first. After the Letter of Offer arrives, have a Safe Electric registered electrician fit a charger from the Smart Charger Register, then send the Payment Request Form with Certificate Number 3, the Test Record Sheet, invoices and photos within 6 months of the offer (SEAI).

How long does the SEAI charger grant take to pay?

About 4 to 6 weeks after SEAI receives all the documents, according to SEAI. It pays by electronic transfer.

Can I claim the grant after the charger is fitted?

No. Work done before a grant offer is issued is ineligible, and spending before the start date on the Letter of Offer doesn't count.

What documents do I need to claim?

The signed Payment Request Form with bank details, Certificate Number 3, the Test Record Sheet, the invoices for the charger and the installation, and photos of the installed charger. Your electrician also completes the Installation Details Form.

How do I check the status of my application?

Use SEAI's application status checker with your email and either your MPRN or your EVHC application ID. Check your junk folder for SEAI emails too.

More EV charger guides

Which charger to buy13 chargers, installed prices, and which suits which house.Tethered or untetheredWhat the fixed cable costs, charger by charger.How long installation takes2 to 4 hours on the day, and the weeks around it.Grant changes€600 to €300, and where it stands in 2026.Apartments and rentersShared car parks, tenants and landlords.Business and taxiCompany cars, tax relief and the taxi scheme.Supplier deal or independentWhat each offer includes, side by side.Zappi vs OhmeManufacturer specs and Irish prices.3-phase chargers11 kW and 22 kW at home, and what ESB charges.SEAI grant checkThree questions, about forty seconds.What it costsEvery installed price.